Viking Line

A full turnkey conversion was made for the SPA area as well as Terrasse, deck 10 during drydocking at Oresund Dry Docks. As layout of the area was partly changed, modification of steel outfitting, piping, HVAC, sprinkler & firefighting system, electrical system etc were required.

The old finishes, decorations and furniture was upgraded to brighter, modern and more luxury choices. Spa Bar was partly upgraded with decorations and furniture. ScanMarine turn-key scope included prefabrication & delivery of all materials and installation onboard.

 

Ships:
M/S Birka Gotland

Total area:
600 m²

Year:
2024